Armattan Chameleon Ti
Carbon Fiber 5” Build
Built at the Washington Aerospace Training & Research Center at Paine Field (KPAE) in 2019. I rebuilt it April 2020 with a new double stack flight control system, the XILO Stax.
The top image is the first configuration, with an Airbot controller. We had a few issues with it during hover testing.
Never quite heard what happened. In any case, the build was nimble and tight through the air.