Armattan Chameleon Ti

Carbon Fiber 5” Build

Built at the Washington Aerospace Training & Research Center at Paine Field (KPAE) in 2019. I rebuilt it April 2020 with a new double stack flight control system, the XILO Stax.

The top image is the first configuration, with an Airbot controller. We had a few issues with it during hover testing.

Never quite heard what happened. In any case, the build was nimble and tight through the air.

Previous
Previous

Tasmanian V1 (13")

Next
Next

FU-RC Kore V2 Matte (5")